Dismantling
Buckler's offer in-depth expertise and five decades of experience
in the selective dismantling of multi-storey buildings, factory
complexes, road/rail bridges and residential houses.
The project illustrated on this page involved the deployment of
a Sarens Heavy Lift Crane to remove a reinforced concrete footbridge
and its supports, which were situated over fully operational main-line
railway tracks.
Before work could commence, a temporary road had to be constructed
to enable access to the bridge and to support the crane, which was
200 tonnes in weight.
Being overhead a main-line railway, access time was at a premium.
The entire dismantling/lifting operation had to be started and completed
within an eight hour overnight period whilst the Railway line was
shut down. |